The main objective of tomorrow’s Work Party will be to try and get plots 13 & 50 to a lettable standard. Plot 50 will require the most of our efforts, as the hedges require trimming and there is a large pond to be filled inas well as the removal of rubish and timber.
If you have a wheelbarrow, spade, rake and or hedge cutting tools please bring them along.
Hot drinks and breakfast rolls will be available.